Zero Interconnect Queue
Conventional data centers wait 4–7 years for utility transmission upgrades. VOLTRA plugs directly into existing substation transformers that already curtail surplus generation.
VOLTRA deploys self-contained, liquid-immersed 40ft compute pods directly at curtailed solar, wind, and hydro substations—turning wasted grid power into sub-2¢/kWh inference capacity in 14 days.
Conventional data centers wait 4–7 years for utility transmission upgrades. VOLTRA plugs directly into existing substation transformers that already curtail surplus generation.
Single-phase dielectric immersion eliminates chillers, raised floors, and municipal water consumption. Sustains 1.04 PUE from -30°C desert winters to +48°C summer peaks.
Automated SCADA telemetry reads substation frequency every 50ms—ramping inference batches up during negative-price spikes and shedding load instantaneously when the grid needs power.
*Compared against standard Tier-4 colocation blended power rate of $0.085/kWh at 1.38 PUE.
| NODE ID | GRID REGION | FEED TYPE | DRAW | PUE | STATUS |
|---|---|---|---|---|---|
| VLT-WEST-01 | ERCOT West · Substation 4B | Curtailed Wind | 1.18 MW | 1.03 | DISPATCHING |
| VLT-MOJ-02 | CAISO Mojave · Feeder 9 | Solar Surplus | 1.22 MW | 1.04 | DISPATCHING |
| VLT-PAC-03 | Columbia Basin · Spillway | Stranded Hydro | 2.34 MW | 1.03 | DISPATCHING |
| VLT-NORD-04 | NO4 Troms · Arctic Line | Hydro + Wind | 1.86 MW | 1.02 | DISPATCHING |