VOLTRA GRID-COMPUTE // REV 2.4
CURTAILMENT FEED: 14.8 MW
MODULAR INFERENCE INFRASTRUCTURE · BEHIND-THE-METER

Stranded megawatts in.
Raw compute out.

VOLTRA deploys self-contained, liquid-immersed 40ft compute pods directly at curtailed solar, wind, and hydro substations—turning wasted grid power into sub-2¢/kWh inference capacity in 14 days.

DEPLOYMENT TIME 14 DAYS
MEASURED PUE 1.04
TARGET POWER COST $0.016/kWh
LOAD SHED LATENCY <180 ms
SCHEMATIC // V-40 AUTONOMOUS POD ONLINE · 1.20 MW
THROUGHPUT 184,200 tok/s
DIELECTRIC BATH 38.4 °C
BUSBAR VOLTAGE 480 V 3Φ
EFFECTIVE RATE $0.015 / kWh
01 // SYSTEM ARCHITECTURE

Built for the 5-year interconnect bottleneck.

SYS-01

Zero Interconnect Queue

Conventional data centers wait 4–7 years for utility transmission upgrades. VOLTRA plugs directly into existing substation transformers that already curtail surplus generation.

FOOTPRINT: 12.19m × 2.44m ISO
SYS-02

Closed-Loop Immersion

Single-phase dielectric immersion eliminates chillers, raised floors, and municipal water consumption. Sustains 1.04 PUE from -30°C desert winters to +48°C summer peaks.

WATER USAGE: 0.00 L/kWh
SYS-03

Sub-Second Grid Stabilization

Automated SCADA telemetry reads substation frequency every 50ms—ramping inference batches up during negative-price spikes and shedding load instantaneously when the grid needs power.

RESPONSE: 165 ms RAMP
02 // POD SIZING & UNIT ECONOMICS

Configure a behind-the-meter cluster.

4 UNITS
1 POD4 PODS8 PODS12 PODS
$0.014 / kWh
CHASSIS ENCLOSUREISO 40FT HIGH-CUBE · NEMA 4X
TRANSFORMER INPUT13.8 kV / 34.5 kV STEP-DOWN
THERMAL REJECTIONDRY-COOLER ROOF ARRAY · 1.25 MW
TELEMETRY UPLINKDUAL FIBER + LEO SATELLITE FAILOVER
ESTIMATED CLUSTER OUTPUT
AGGREGATE LOAD CAPACITY 4.80 MW
PEAK INFERENCE 736.8k tok/s
ANNUAL POWER SAVINGS* $2.41M / yr
EFFECTIVE CAPACITY FACTOR 82%
DEPLOY SCHEDULE 21 DAYS

*Compared against standard Tier-4 colocation blended power rate of $0.085/kWh at 1.38 PUE.

03 // LIVE NODE TELEMETRY

Active substation pilot deployments.

NODE ID GRID REGION FEED TYPE DRAW PUE STATUS
VLT-WEST-01 ERCOT West · Substation 4B Curtailed Wind 1.18 MW 1.03 DISPATCHING
VLT-MOJ-02 CAISO Mojave · Feeder 9 Solar Surplus 1.22 MW 1.04 DISPATCHING
VLT-PAC-03 Columbia Basin · Spillway Stranded Hydro 2.34 MW 1.03 DISPATCHING
VLT-NORD-04 NO4 Troms · Arctic Line Hydro + Wind 1.86 MW 1.02 DISPATCHING